Q. Scheduling
Q. Scheduling software
is a revolutionary construction scheduling software that has
evolved in response to the widely recognized failure of the majority of
construction contractors to fully use CPM or PERT, and adopt it as a basic construction scheduling technique, which suggested that
there is some fundamental failure in the Critical Path Method and PERT network
technique. This unwillingness flies in the face of a great deal of publicity
promoting the use of Critical Path Method and PERT in construction scheduling.
Such publicity has been supported by academic research which has failed to ask
the basic question as to the feasibility of Critical Path Method or PERT for
construction. If some contractors have to provide a Critical Path Method/PERT
network in the bid at the request of the client, they usually employ an outside
consultant to do it, pass his fee on to the client as part of the bid, and
continue to manage the project in their own more appropriate manner. Therefore,
it can be said that the construction industry has to a large extent rejected the
Critical Path Method and PERT concepts, same as human bodies would reject
medically transplanted organs from non related humans.
The low weighting on cost control and efficient use of resources in the concept of Critical Path Method
and PERT resulted in a model that is not the best approximate model of the
construction process. Q. Scheduling core concept is ensuring a continuation of
work flow for each group of employed resources in order to minimize associated
costs.
Q. Scheduling is quantitative scheduling in the context that quantities to be executed at
different locations of the construction project form the elements of the
schedule. Also Q. Scheduling is Queue Scheduling in the context that trades pass
through the different segments of the project in a queue sequence. No
interference between two activities is allowed at the same location. It is
derived basically from the Line of balance technique with some modifications to
allow for the non repetitive models that is characteristic of the majority of
construction projects.
Why Contractors choose Q. Scheduling as a favorite
Construction scheduling software?
- Q. Scheduling focuses on cost minimization by ensuring best use of resources, and a continuing flow of work for each trade.
- Q. Scheduling is simple to use, no sophistication or training is required.
- Unsuitability of the network analysis techniques to the construction industry in respect of their disregard to cost.
|
Procedures
Analyze the project to
be constructed into suitable locations through vertical and/or horizontal
segmentation. A proper Bill of quantities can form a starting point.
Enter activities in
their logical sequence at one location.
Enter corresponding
quantities for each activity in each location.
Q. Scheduling software
shall
analyze all alternative sequences of locations and give you its
recommendation in respect of the most economic alternative (s). However this
recommendation is not binding.
Select most suitable
sequence of locations either from the recommended ones or else if you have
constraints in respect of some locations and would rather have them at a
later stage.
You may optimize your
planned output for your selected saved Sequence by pressing
"Optimize"
Save the produced
schedule as original Schedule.
At any time you may
enter executed quantities up to a particular cut off date and compare actual
construction progress with planned one.
Required data to use Q.
Scheduling as an efficient construction scheduling software:
Start and Finish Dates of the project.
List of Segments/Locations of the Project.
List of Activities to be done in logical sequence at any segment.
Estimated quantities corresponding to each activity at each segment.
List of Capacities of teams for each activity or trade (an average daily output), which shall be
optimized for you by Q. Scheduling software.
Exclusive Benefits you
get by using Q scheduling software for construction scheduling include:
Analytical comparison of
possible alternatives in respect additional costs, likely to be incurred, as
proportion of the most economic alternative.
Optimization of
performance rates for each alternative.
Start and Finish dates
for each crew on site that ensures a continuation of work flow.
A due consideration of
days off.
|
Most suitable for small and medium size projects
- The current version of Q Scheduling is limited
to projects comprising up to 10 activities at a maximum of 5
locations i.e. a maximum of 50 items, with an overall duration not exceeding 24 months.
|
Read
more about Construction Scheduling Techniques Click
Top/left buttons for more information about the product.
This construction scheduling software is also available as a web based software
where no download is required at construction
software online for a nominal fee per session.
|