"Time is money" is a favored phrase of business people. Is it true in the
context of construction projects? Contractors and designers may apply a crash
costing technique to determine how much it is likely to cost them to deliver the
building earlier than specified in the tender documents. Indeed many building
clients are prepared to pay for a building which can be occupied or rented
earlier than anticipated.
But if building faster is going to cost money then how much? And do we have
to build every thing at top speed or can we accelerate some things and leave
others alone? An illustrative example is presented as follows:
- A commercial building has been designed for a property company and tender
documents are prepared such that the building must be ready for occupation in 20
months.
- The client is anxious to let the building and asks how much it more
would he have to pay to if he were to take over the building in after 15 months.
To achieve this shorter timescale the Contractor has to put in extra
resources and therefore the tender price is likely to be higher. In effect costs
and time can be exchanged. The shorter the time for a project, the more
expensive it is likely to be. However, there is a minimum duration beyond which
the project time can not be reduced. this is known as crash point.
For a quick estimate of additional cost in connection with project
timescale shortening up to 33% you can try misronet tool below. It it designed
for building projects, and is based on the S-Curve time cost relation.
| Initial Project Cost: | |
| Cost of Building materials: | |
| Initial Duration (days): | |
| Required duration (days): | |
| New Project Cost | |
|
Construction Delay Analyzer |
On the other hand Delay in Construction Projects, is a grey area where responsibility for the delay is difficult to analyze. Who is responsible for the delay? Is it the Contractor's delayed performance or is it the Employer Change orders? Is it conditions beyond the control of the contractor or is he liable for damages resulting from such delay?
Delay in Construction is best analyzed by CM Reporter, a Software for
reporting responsibility of encountered delay in construction and helps in Delay
claim justification.
A simple Construction claim analyzer for quick reporting responsibility of
encountered delays in construction and overall performance of projects. Enhanced
Reporter includes forecasting of the completion date based on shifted
performance assumption and 'not as planned productivity rates' assumption
graphically presented for comparison. The technique used enables early
adjustment of resources and anticipation of additional costs likely to be
incurred in the construction process.
An essential Software for Contractor's justification of his Construction
Claim in respect of delay and application for extension of time.Installation:
Download Free Trial zip file (5.17MB)